Document content statuses
While any document is being created, Project Health shows Generating instead of its normal review badge. Blueprint Summary polls the stored run state while it is open, so finished cards and Project Health update without reloading the whole page.
Not yet reviewed and Reviewed
- Not yet reviewed means you have not opened the current version of one of the 10 document cards.
- Reviewed means you opened that current document page. It records review only; it is not an approval signature.
- A regenerated, restored, or newly published version can return a document to Not yet reviewed.
Sign Approve Blueprint
There is one approval for the complete current document set. There is no per-document Sign Approve action.1
Finish generation
Wait until the document spinners stop and Project Health no longer shows Generating.
2
Review all 10 current documents
Open every current document card until each shows Reviewed. This includes opening a Not Required stub once.
3
Clear approval blockers
Resolve any Needs Repair or Blocked item. Regenerate affected documents and review their new versions.
4
Approve the current set
In Blueprint Documents, select Sign Approve Blueprint. This accepts the current Blueprint as one connected package.
Project health and before-go-live items
The Project Health panel collects blockers, review notes, and work that should be completed before production launch. These are not all equal:- a review note is a visible assumption, decision, risk, or warning that deserves attention; it does not automatically mean a document is broken;
- a Before go-live item may be completed during implementation;
- a blocker prevents dependent work;
- a repair means the current document cannot safely join an approved Blueprint.